Case Studies

A series of case studies relating to our services and industry sector

Harvesting Various Semiconductor Parts for Obsolete Tools
Installing a 12m-Long Press Through a Third-Storey Window: A US First for HP
The Subtle Art of Relocating Complex, One-of-a-Kind Equipment Across Borders
A Complex Intercontinental Move and Assembly Project for Multiple Ion Implanter Tools
Installing HP’s New Inkjet Press for its European Premiere at Hunkeler Innovationdays 2023
A Successful Cleanroom Expansion for Plessey
Enabling Growth of Next Generation Power Electronics Semiconductor Technology
Intricate Equipment Relocation for a Multimillion-Pound Facility
18 Tons of Equipment Installed for Leading Pharma Manufacturer, Catalent
Two World Firsts: Move and Installation for HP Print Press
Critical Machinery Move for Advanced Automotive Technology
Fast export packing helped meet sustainability demand
CE Marking from IES Fast-Tracked Security Game-Changer
Fast and Efficient Export Packing for Exciting New Industry
A Complex Machine Relocation for Battery Tech Innovators
How We Made a Multi-Million Pound Move Look Easy
Large Food Tech Machines Braced for Export Shipping to USA
Marked for Success: Quick CE Marking Readied New Machinery
With Delicacy to Dubai: The Story of 650 Decorative Plaster Lengths
Factory Move into New HQ for Vision Engineering
Construction Design Management (CDM) Capability at IES
Complex Laser System Installation at Nottingham Trent
Recounting a Complex International Factory Relocation
Cleanroom move at Bristol University
Building a Structural Machine Base for University of Southampton
Complex Laboratory Move for Pirbright Institute
Print Press Relocation for CPI Books