From Cleanroom to Crate: Preparing a Purion Ion Implanter for Transport
Fully deinstalled and packed an Axcelis Purion ion implanter from a live cleanroom in 5 days, for a client relationship dating back to 1997....
We're actively recruiting for a range of roles across sales, engineering, IT and warehouse. Check our careers page to see open positions including apprenticeships.

At IES, we love a challenge. In fact, the more complex the project is, the better.

Few complex engineering projects compare to the challenge of relocating sensitive, high-technology equipment across borders.

At IES, we partner with leading global manufacturers to provide an extensive portfolio of advanced technologies supporting research, development, and production across the semiconductor and compound materials industries.

Whether you’re moving a single piece of equipment or an entire production line, our trusted team of engineers can support every step of your move, from rigging to end-to-end relocation support across the globe.

A series of case studies relating to our services and industry sector.
Fully deinstalled and packed an Axcelis Purion ion implanter from a live cleanroom in 5 days, for a client relationship dating back to 1997....
Relocated 7 bespoke laser cutting systems (each ~2.5 x 2.5m, ~3 tonnes) from Wentworth Puzzles' Malmesbury dairy-farm site to a new facility in...
Designed and installed IES's largest-ever structural machine base — a two-tonne, powder-coated steel frame measuring 1,825 x 1,900 x 1,180 mm — for...
Achieved a US-first installation for HP, installing a 12m-long PageWide Web Press T250 HD through a third-storey window — the only viable access...
Relocated a one-of-a-kind PVD/RF sputtering tool 400 miles from Tours, France to the Institute of Science and Technology (LIST) in Luxembourg — a...
Deinstalled and relocated a 30-year-old ion implanter from a Portland, Oregon semiconductor fab to a client's new €100 million European R&D facility,...
Delivered 500+ crates and installed 90 semiconductor tools (306+ tonnes, 1,958 m³ total volume) for Plessey's 200mm cleanroom expansion, sourcing...
Relocated 20 tonnes of precision equipment (15 critical items including CNC mills, a CNC Turning Centre, lathes, a CMM measuring system) for AB...